NTF. NO. 26/2011-CE, DT. 24/03/2011
- Document type
- Notification
- Reference no.
- M
- Dated
- Category
- Tariff
Post Budget 2011 Notification
Post Budget 2011 Notification
In the said notification, in the Table,-
(I) for S. No. 12D and the entries relat ing thereto, the following S. No. and entries shall be substituted, namely :-
| (1) | (2) | (3) | (4) | (5) |
| 12D | 844399 | Parts for the manufacture of printers falling under sub-heading 844332 | 5% | 2 and 3; |
(II) Against S. No. 91C, in column (3), for the Explanation, the following shall be substituted, namely:-
Explanation.- For the purpose of this exemption, Mega Power Project means:-
(a) A thermal power plant of a capacity of 700 MW or more, located in the States of Jammu and Kashmir, Sikkim, Arunachal Pradesh, Assam, Meghalaya, Manipur, Mizoram, Nagaland and Tripura; or
(b) A thermal power plant of capacity of 1000 MW or more, located in States other than those specified in clause (a) above; or
(c) A hydel power plant of a capacity of 350 MW or more, located in the States of Jammu and Kashmir, Sikkim, Arunachal Pradesh, Assam, Meghalaya, Manipur, Mizoram, Nagaland and Tripura; or
(d) A hydel power plant of capacity of 500 MW or more, located in States other than those specified in clause (c) above..
[F. No. B-1/3/2011- TRU]
(Sanjeev Kumar Singh)
Under Secretary to the Government of India