Para 6.21.4
- Document type
- Procedure
- Reference no.
- 06
- Dated
Sub-Contracting
Sub-Contracting 6.21.4
EOUs may be permitted to remove moulds, jigs, tools, fixtures, tackles, instruments, hangers and patterns and drawings to the premises of sub-contractors subject to the conditions that these shall be brought back to the premises of the units on completion of the job work within a stipulated period. The raw materials may or may not be sent along with these goods.
EOUs may be permitted to remove moulds, jigs, tools, fixtures, tackles, instruments, hangers and patterns and drawings to the premises of sub-contractors subject to the conditions that these shall be brought back to the premises of the units on completion of the job work within a stipulated period. The raw materials may or may not be sent along with these goods.