Para 5.8
- Document type
- Procedure
- Reference no.
- 05
- Dated
Fulfillment Of Export Obligation
Fulfillment Of Export Obligation 5.8
The licence holder under the EPCG scheme shall fulfill the export obligation over the specified period. in the following proportions:
The licence holder under the EPCG scheme shall fulfill the export obligation over the specified period. in the following proportions:
| Period from the date of issue of licence | Minimum export obligation to be fulfilled |
| Block of 1st to 6th year | 50% |
| Block of 7th and 8th year | 50% |