Para 4A.21.3
- Document type
- Procedure
- Reference no.
- 04
- Dated
Replenish-ment Basis
Replenish-ment Basis 4A.21.3
The exports shall be effected within a period of 120 days from the date of booking and the drawal of the precious metal shall be completed within a period of 150 days from the date of booking or within 30 days from the date of export whichever is later.
The exports shall be effected within a period of 120 days from the date of booking and the drawal of the precious metal shall be completed within a period of 150 days from the date of booking or within 30 days from the date of export whichever is later.