8.63
- Document type
- Procedure
- Dated
- Category
- HB Vol.1 (upto 31/03/2001)
Replenishment Basis
The exports shall be effected within a period of 120 days from the date of booking and the drawal of the precious metal shall be completed within a period of 150 days from the date of booking or within 30 days from the date of export whichever is later.