6.21.4
- Document type
- Procedure
- Dated
Sub-Contracting
Sub-Contracting
6.21.4
EOUs may be permitted to remove moulds, jigs, tools, fixtures, tackles, instruments, hangers and patterns and drawings to premises of sub-contractors, subject to conditions that these shall be brought back to premises of units on completion of job work within a stipulated period. Raw materials may or may not be sent along with these goods.
6.21.4
EOUs may be permitted to remove moulds, jigs, tools, fixtures, tackles, instruments, hangers and patterns and drawings to premises of sub-contractors, subject to conditions that these shall be brought back to premises of units on completion of job work within a stipulated period. Raw materials may or may not be sent along with these goods.