5.8
- Document type
- Procedure
- Dated
Condition for Fulfilment of Export Obligation
Condition for Fulfilment of Export Obligation
5.8
The Authorisation holder under the EPCG scheme shall fulfill the export obligation over the specified period in the following proportions:
5.8
The Authorisation holder under the EPCG scheme shall fulfill the export obligation over the specified period in the following proportions:
| Period from the date of issue of Authorisation | Minimum export obligation to be fulfilled |
| Block of 1st to 6th year | 50% |
| Block of 7th and 8th year | 50% |