Skip to main content
India's Trade & Customs Knowledge Base
Live on PostgreSQL About• Contact• Sign in Subscribe
EK EXIMKEY
Export · Import · Customs · DGFT Intelligence
Policy

New Industrial Policy

Document type
Policy
Dated
Category
Policy

Supply of Power

  • The State of J&K is moving toward self-sufficiency in production of electrical energy. Presently, there are gaps in its peak load requirements and the maximum supply available. But as a matter of policy, the industry shall be given priority while making quality power supply to the consumers. The State has a very vast potential for generating hydro-electricity, with about 15000 MWs aldready identified. The State has recently signed MOUs with experienced and reputed international firms for execution of 450 MWs Baglihar Project, 390 MWs Kishanganga Project and also for investigation of 280 MWs Uri Phase II Project. With the commissioning of these power projects over the next about 4 years, the State would become self-sufficient in power generation.

  • All the industrial estates shall have dedicated power receiving stations as per their assessed load. Power connection shall be available at the door step of the promoter. Those needing supply of energy at HT transmission shall be required to install their own receiving stations.

  • The industrial power-tariff is regulated by the Statute. Presently, the tariff for industry is fairly attractive.

  • The industrial units may install their own captive power generation plants. In case of these power stations, no electricity duty shall ble levied by the government.

  • Related Content

    In This Category

    48,405
    HS Codes covered
    Section to 8-digit product level
    37,765
    Regulatory documents
    DGFT, Customs, Excise, RBI & GST
    152,183
    Import duty lines
    Tariff lines with effective rates
    20,499
    SION norms
    Standard input–output norms