Instruction No. 03/2023- Customs, DT. 27/01/2023

Dated
27 Jan 2023
Reference no.
03/2023- Customs

Cancellation of swapping order w.r.t. 8th & 9th Reallocation of Export Quota for export during Sugar Season 2022-23 and holding of export quota-regarding

Instruction No. 03/2023-Customs
F.No. 401/35/2022-Cus-I1
Government of India
Ministry of Finance Fo
Department of Revenue
(Central Board of Indirect Taxes & Customs)

North Block, New Delhi
Dated, 27" January, 2023

To
All Principal Chief Commissioners/ Chief Commissioner of Customs All Principal Chief Commissioners/ Chief Commissioner of Customs(Preventive) All Principal Chief Commissioners/ Chief Commissioner of CGST & Customs All Principal Director Generals /Director Generals under CBIC All Principal Commissioners / Commissioners of Customs Madan//Sir,

Subject: - Cancellation of swapping order w.r.t. 8th & 9th Reallocation of Export Quota for export during Sugar Season 2022-23 and holding of export quota-regarding Please refer to Instruction No. 33/2022 dated 12.12.2022 on the above subject.

2. Vide F.No. 1-1/(2022)-Trade letter dated 23.01.2023 (copy enclosed), Department of Food & Public Distribution (DFPD), Ministry of Consumer Affairs, Food & Public Distribution has informed about cancellation of the following sugar mills till further orders in reference to its 8th & 9th Reallocation of Export Quota for export during Sugar Season 2022-23 and holding f export quota as under:-

i. SI. No. 'l' of 8th reallocation order dated 26.12.2022 (page 96), SI. No. | Plant Code Plant Name Export Quota (in MT)

1 35401 BIJAPUR 14403

2 52901 HAVARGAON 4696

i. SI. No. '25' of 9th reallocation order dated 02.01 .2023 (page 98):- SI. No. | Plant Code Plant Name Export Quota (in MT)

I 35401 HAVARGAON 4696

2 35501 SANT DHAMAIJI 5497

3. Accordingly, DFPD has advised to put on hold export quotas of above mentioned sugar mills and to not allow export of sugar from the above-mentioned 3 sugar till further orders.

4. It is requested that necessary action may be taken to sensitize officers under your jurisdiction for compliance of the above order of DFPD.

Encls: as above
(Manish Kumar Choudhary)

Joint Commissioner (Customs-II1)

Email: manish.irs(@gov.in
Tele: 011 23094012
F.No. 1-1/(2022)-Trade
Government of India
Ministry of Consumer Affairs, Food & Public Distribution Department of Food & Public Distribution (DFPD)

Krishi Bhawan, New Delhi
Dated the 23% January 2023

To
CBIC, Department of Revenue.

Subject: Cancellation of swapping order w.r.t. 8 & 9" Reallocation of Export Quota for export during Sugar Season 2022-23 and holding of export quota.

Sir,

| am directed to refer to the 8" & 9" reallocation order dated 26.12.2022 & 02.01.2023 respectively (copy enclosed) and to say that reallocation orders for the following sugar mills stands cancelled till further orders:-

i. SINo. ‘1’ of 8" reallocation order dated 26.12.2022,

rt ta
SI. Plant Code Plant Name a

35401 BIJAPUR 14403

2 52901 HAVARGAON 4696

i. SI. No. ‘25’ of 9" reallocation order dated 02.01.2023:- Sl. Plant Code Plant Name oe

1 52901 HAVARGAON 4696

2 35501 SANT DHAMAJI 5497

2. The export quotas of above mentioned sugar mills have been put on hold.

3. Further, it may kindly be ensured that the above-mentioned 3 sugar mills should not export any sugar till further orders of this Directorate. Yours faithfully,

Bo
(Dilip Kumar Jha)

Under Secretary to the Govt. of India,

Tele: 011-23380552

Copy to:

1. Chairman, CBIC, Department of Revenue.

2. DGFT, Ministry of Commerce.

3. Principal Secretary/Secretary (Food) of State Governments

4. State Cane Commissioner
Copy also to:- M/s. Shri Sant Damaji SSK Ltd, (35501/SANT DAMAJI) M/s. Nandi SSK Ltd., (35401/BIJAPUR)

M/s. DDN SFA LTD (52901/HAVARGAON)

F.No. |-1/(2022)-'I'rade
Government of India
Ministry of Consumer Affairs, Food & Public Distribution Department of Food & Public Distribution (DFPD)

Krishi Bhawan, New Delhi
Dated the 26 December 2022

To
The CEO/MD/GM of Sugar mills.

(As per list attached)

Subject: 8th Reallocation of Export Quota for export during Sugar Season 2022-23 and consequent adjustment of Monthly release quantity on account of exchange of export quantity with domestic monthly release quantity.

Madan/Sir,

In order to prevent uncontrolled export of sugar & with a view to ensure sufficient availability of sugar for domestic consumption at a reasonable price, Government has decided to allow export of sugar up to a reasonable limit w.e.f 01.11.2022 till 31.10.2023. Directorate General of Foreign Trade (DGFT), Ministry of Commerce vide Notification No. 40/2015-20 dated 28.10.2022 has also amended export policy in respect of sugar.

2. Subsequently, DFPD vide letter of even number dated 05.11.2022 has allocated export quota of 60 LMT to sugar mills for sugar season 2022-23 w.e.f. 01.11.2022 along with the guidelines for export of sugar.

3. As per clause ‘E’ of the guidelines dated 05.11.2022, DFPD has decided to allow exchange of Export quantity from the quantity of monthly release quota. In this regard, representations along with agreements between sugar mills involved in exchange of their Export quantity and domestic monthly release quantity have been examined in this Department and accordingly additional export quantity has been allocated and domestic quota of the sugar mills have also been adjusted as mentioned in Annexure.

Yours faithfully,

(Sangeet)

Director (Sugar)

Tele: 23383760

Copy to:

1. Chairman, CBIC, Department of Revenue.

2. DGFT, Ministry of Commerce.

3. Principal Secretary/Secretary (Food) of State Governments

4. State Cane Commissioners
Mills surrendering Export Quota 2022-23
8" Reallocation
(Quantity in MT)

Mills surrendering Domestic Sales Quota
Export
Si Export .

Export Ri id i
No | PlantCode | Plant Name Quota ason | _ Quota Peseen Plant Quota | Revised 38 Surrender xport Code Plant Name ason Export | Deduction to be made from domestic quota 12.2022 ed Quota 26.12.2 Quota
1 35401 BUAPUR 8 equal installment of 1600 MT from Jan 2023 to 14403 14403 0 52901 HAVARGAON 4696 19099 Aug 2023 and 1603 MT in Sept 2023 for transferring to BUAPUR/35401
2 3501
SHAMLI 12000 | 12000 0 4 equal installment of 3000 MT from Jan 2023 to 17901 PHALTAN 13130 36018 April 2023 for transferring to SHAMLI/3501 3 30701 PONNI 10888 10888 0 4 equal installment of 2722 MT from May 2023 to August 2023 for transferring to PONNI/30701
4 48501 RUPAPUR 8000 8000 0 15401 SANGLI 70387 78387 4 equal installment of 2000 MT from Jan 2023 to April 2023 for transferring to RUPAPUR/48501
5 5 equal installment of 3333 MT from Jan 2023 to 5801 DHAMPUR 45000 20000 25000 37501 SAMSHERPUR 43335 63335 May 2023 & 3335 MT for June, 23 for transferring to DHAMPUR/5801
RAJAKA 9 equal installment of 1530 MT from Jan 2023 to 6 6001 SAHASPUR 13770 13770 (o) Sept 2023 for transferring to RAJAKA

SAHASPUR/6001

8 equal installment of 1468 MT from Jan 2023 to
7 67601 KARIMGANJ 13220 13220 0 Aug 2023 & 1476 MT for Sept, 23 for transferring

38801 KOREGAON 113297 | 155486 | to KARIMGANI/67601

3 equal installment of 2810 MT from Jan 2023 to
8 58301 RANINANGAL 23830 8430 15400 March 2023 for transferring to

RANINANGAL/58301

2257 MT for Jan, 2257 MT for Feb, 23 and 2255

3) 3001 DEOBAND 31769 6769 25000 MT for March, 23 for transferring to

DEOBAND/3001

5 equal installment of 5000 MT from Jan 2023 to
25000 46801 MURUM 9828 34828 May 2023 for transferring to

THANABHAWAN/56101

JABHAWAN 27200 10)

iS 56101 7HeN 8 equal installment of 275 MT from Jan 2023 to 2200 12701 PRAVARANAGAR 36828 39028 Aug 2023 for transferring to

THANABHAWAN/S6101

8 equal installment of 2451 MT from Jan 2023 to
11 6601 BAHERI 22063 22063 (0) 63501 HAVINAL 5144 27207 Aug 2023 and 2455 MT in Sept 2023 for transferring to BAHERI/6601
156743 156743
7o_-
Si
F.No. 1-1/(2022)-Trade
Government of India
Ministry of Consumer Affairs, Food & Public Distribution Department of Food & Public Distribution (DFPD)

Krishi Bhawan, New Delhi
Dated the 02™ January 2023

To
The CEO/MD/GM of Sugar mills
(As per list attached)

Subject: 9th Reallocation of Export Quota for export during Sugar Season 2022-23 and consequent adjustment of Monthly release quantity on account of exchange of export quantity with domestic monthly release quantity.

Madam/Sir,

In order to prevent uncontrolled export of sugar & with a view to ensure sufficient availability of sugar for domestic consumption at a reasonable price, Government has decided to allow export of sugar upto a reasonable limit w.e.f 01.11.2022 till 31.10.2023. Directorate General of Foreign Trade (DGFT), Ministry of Commerce vide Notification No. 40/2015-20 dated 28.10.2022 has also amended export policy in respect of sugar.

2. Subsequently, DFPD vide letter of even number dated 05.11.2022 has allocated export quota of 60 LMT to sugar mills for sugar season 2022-23 w.e-f. 01.11.2022 along with the guidelines for export of sugar.

3. As per clause ‘E’ of the guidelines dated 05.11.2022, DFPD has decided to allow exchange of Export quota quantity from the quantity of monthly release quota. In this regard, representations along with agreements between sugar mills involved in exchange of their Export quota quantity and domestic monthly release quantity have been examined in this Department and accordingly additional export quantity has been allocated and domestic quota of the sugar mills will be adjusted as mentioned in Annexure.

Yours faithfully,

4 Jy
f
(Sangeet)

Director (Sugar)

Tele: 23383760

Copy to:

1. Chairman, CBIC, Department of Revenue
2 DGFT, Ministry of Commerce

3. Principal Secretary/Secretary (Food) of State Governments

4. State Cane Commissioners

Annexure
9th Reallocation ,

__ (Figures in MT)

Mills surrendering Export Quota 2022-23 Mills surrendering Domestic Sales Quota Export 3 Export a.

Export Revised Revised
x . i Plant Name “ Quota Export Ln Plant Name _ Export Adjustment in the domestic quota 0.

02.01.2023 | Surrendered | Quota 02.01.2023 | Quel F 5 equal installment of 840 MT from Feb 2023 to June 7200 S28) | BHIGARWADI SpA0 7840 2023 for transferring to Naraingarh /37701 500 MT in Feb, 500 MT in March, 750 MT in April, 23,

2880 69039 | RAVADEWADI 20074 22954 | 751 Mt IN May, 23 and 379 MT in June, 23 for 3 ARH transferring to Naraingarh /37701
1 | 37701 | NARAING ae 1249 0 14901 KRISHNA 26439 27688 1000 MT in Feb,23 and 249 MT in march for transferring | 7 to Naraingarh /37701
2 equal installment of 500 MT from July 2023 to August 1415 2023 and 415 MT in the month of Sep for transferring toNaraingarh /37701
=O] || GAGE 10388 | 15788 > equal installment of 1300 MT from July 2023 to August 3985 2023 and 1385 MT in the month of Sep for transferring to Mukerian/34201
2 | 34201 MUKERIAN 6145 0 2 equal installment of 540 MT from April 2023 and May 1080 40201 PARTUR 10504 Lise4 2023 for transferring to Mukerian/34201 1080 2 equal installment of 540 MT from April 2023 and May BALIRAIJA- 2023 for transferring to Mukerian/34201 _ 69017 PURNA 13807 15967 | 2 equal installment of 540 MT from Feb 2023 to 1080 March,23 for transferring to Paliakalan /6501 | (Partur/40201)

2 equal installment of 540 MT from Feb, 23 to March, 23

RTUR J

ai ath M584 | 12664 | ‘for transferring toPaliakalan /6501

3 6501 PALIAKALAN 8000 0 F

450 MT in the month of Feb 2023 ,650 MT in May2023,

4389 14501 GURSALE 4873 9262 3 equal installment of 700 MT from June to August and 1189 MT in Sep for transferring toPaliakalan /6501 145] 700 MT in the month of Feb and 751 MT in April for

- 14901 | KRISHNA 27688 | 31839 | lansferring to Paliakalan /6501 — 2700 1700 MT in the month of Feb and 1000 MT in April for } a _ transferring to Bhadson/42202 _
4 | 42202 BHADSON 6844 0 540 MT in the month of Feb 2023 for transferring to BALIRAJA- Bhadson /42202
540 )

L 69017 PURNA 15967 16507

%

¥
z
&
1600
1464
14501
69039

GURSALE

9262
10862
‘| 450 MT in the month of Feb 2023 ,500 MT in March

RAVADEWADI

22954
24418
2023, and 650 MT in April for transferring to Bhadson 142202 _
750 MT in the month of March and 714 MT in April for transferring to Bhadson /42202
40201

PARTUR

12664
13204
540 MT in the month of Feb 2023 for transferring to Bhadson /42202
60301

MAQSUDPUR

14290
3012
11278
57801

BARKHERA

19599
61601

UTTUR

55523
59270
2 equal installment of 1506 MT from Feb 2023 to March,

23 for transferring to Maqsudapur/60301
350 MT in the month of Feb 2023 and 385 MT in the month of March, 23 for transferring to Barkhera/57801 3269
15595
57701

KHAMBARKH

ERA
14596
14596
52401

PAWARWADI

25922
43787
4 equal installment of 655 MT from Feb 2023 to May 2023 and 649 MT in the month of June 2023 for
transterring to Barkhera/57801
4 equal installment of 2920 MT from Feb 2023 to May 2023 and 2916 MT in the month of June 2023 for
transferring to Khambarkhera/57701
60601

KUNDARKHI

1515
1515
60301

MAQSUDPUR

11278
4500
6778
63501

HAVINAL

27207
33222
5 equal installment of 303 MT from Feb 2023 to June 2023 for transferring toKundcrkhi/60601 |
4 equal installment of 1125 MI from Feb 2023 to May 67201

SOUBHAGYAL

AXMI

9767
A167
32501

ALAND

5000
24701

RAJESHWARAP

URAM

19286
24053
2023 for transferring to Maqsudapur/60301 |
4 equal installment of 955 MT from April 2023 to July 2023 and 947 MT in the month of August for transferring to Soubhagyalaxmi/67201 (Aland/32501)

4597
9597
2 equal installment of 1500 MT from April 2023 to May and 2 equal installment of 1000 MT from June 2023 to July 2U23 for transferring to Soubhagyalaxmi/67201 62201
59101

KODIYA

RAIPURA

1731
1731
13801

BHAVANINAGA

R
17025
18756
1731 MT in the month of Feb 2023 for transferring to Kodiya/62201
10000
10000
37501

SAMSHERPUR

63335
73335
5 equal installment of 2000 MT from February 2023 to 24201

THANDAVA

24301

VIJAYARAMA

24101

ETIKOPPAKA |

| it
51901

MUDHOI.

90197
June 2023 for transferring to Rajpura/59101
4 equal installment of 152 MT from March 2023 to June 2023 and 154 MT in the month of July for transferring to Thandava/24201
4 equal installment of 139 MT from April 2023 to July 2023 and 141 MT in the month of August for transferring,

toVijayarama/24301
4 equal installment of 112 MT from Feb 2023 to May 2023 and 115 MT in the month of June for transferring to Tikoppaka/24101
ze
mM
2204

BULANDSHAH

R
6675
3901

CHANDPUR

13308
9542
2208

BIJNOR

8355
18796
| 5 equal installment of 1335 MT from Feb 2023 to June |

2023 for transferring to Bulandshahr/2204
4 equal installment of 755 MT from Feb 2023 to May | 2023 and 746 MT in the month of June for transferring to Chandpur/3901
34501

DHANAURA

30458
40000
4 equal installment of 1910 MT from Feb 2023 to May 2023 and 1902 MT in the month of June for transferring to Chandpur/3901
15901

NAGEWADI

2301
2301
33601

TASGAON

2899
2899
16701
Daulat
13904
19104
3 equal installment of 767 MT from March 2023 to May 2023 for transferring to Nagewadi/15901
2 equal installment of 970 MT from Feb 2023 to March | 2023 and 959 MT in the month of April for transferring to Tasgaon/33601
33901

MEHAM

6527
6527
68301

SRI SRI SUGAR

12087
18614
2 equal installment of 2222 MT from Feb 2023 to March 2023 and 2083 MT in the month of April, 23 for
transferring to Meham/33901
pal
60501

RUDHAULI

4926
60901

ITA] MAIDA

8631
3557
5074
16501

BHOGAWATI

69059
Sangamnath
10908
19391
1135 MT in the month of April 2023, 2000 MT in May 2023 and 1791 MT in June 2023 for transferring to Rudhauli/60501 _ |
2000 MT in the month of Feb 2023 and 1557 MT in
month of March 2023 for transferring to Itai
Maida/60901
5433
10507
7 equal installment of 634 MT from Feb 2023 to August 2023 and 636 MT in the month of Sep 2023 for
transferring to Itai Maida/60901
55601

KINAUN]

28327
1308
20000
7019
16501

BHOGAWATI

19391
20699
443 MT in the month of March 2023 and 865 MT in April 2023 for transferring toKinauni/55601
8401

PRATAPPUR

2981
62101

BELLAD-

BAGEWADI

30000
40000
5 equal installment of 1250 MT from Feb 2023 to June | 2023 and 769 MT in the month of July 2023 for
transferring to Kinauni/55601
481 MT in the month of June and 2 equal installment of 1250 MT from July 2023 tu Aug 2023 for transferring to Pratappur/08401
35501
SantDamaji
40701
Jmampur
3702

CHILWARIA

5497
4845
2500
3716
52901

HAVARGAON

19099
24596
6 equal installment of 785 MT from n Feb 2023 to July 2023 and 787 MT in the month of Aug, 2023 for
transferring to SantDamiji/35501
37601
61601
Kaij

UTTUR

13975
59270
18820
61770
3 equal installment of 1211 MT from May 2023 to July 2023 and 1212 MT in the month of August 2023 for transferring to Imampur/4070L
| Chitwariv/3702
2 equal installment of 800 MT from Feb 2023 to March | 2023 and 900 MT in the month of April for transferring to 2 cqual installment of 1667 MT from Feb 2023 to March 28 | 6301 GOLA 5000 5000 0 54901 GAGAN 15788 20788 | 2023 and 1666 MT in the month of April for transferring _. to Gola/6301 (Gagan/54901)

6 equal installments of 968 MT from the month of Feb 29 | 60301 | MAQSUDPUR 6778 6778 0 2023 to July 2023 and 970 MT in the month of Aug 2023 transferring toMaqsudpur/60301
Tage SANGLI qe38? S178 4 equal installment of 322 MT from Feb 2023 to May 30 | 57801 | BARKHERA 15595 1613 13982 2023 and 325 MT in the month of June 2023 for transferring to Barkhera/57801
4 equal installment of 2795 MT from Feb 2023 to May 31 | 57801 BARKHERA 13982 13982 0 17901 PHALTAN 36018 50000 | 2023 and 2802 MI in the month of June 2023 for transferring to Barkhera/57801
3 equal installments of 483 MT in the month of Feb 2023 32 | 1901 Sriganganagar 1449 1449 0 12901 SHRIGONDA 15652 17101 | to April 2023 transferring to _ Sriganganagar/1901.(ShriGonda/12901)

33 9992 49201 | LIBBERHERI 16958 26950

34 59701 Shermau 18775 5283 3500 Mill-wise deduction/adjustment is not required in group —— 57401 | PUDRIKHURD 29192 37068 | sugar mills
35 | 59601 Khaikheri 13924 2593 11331
197987
197987
Ze
pis

Source: Central Board of Indirect Taxes and Customs (CBIC). View the official document.